Facilities' Construction Panel
Date published: 2022
Please login or subscribe to view UPM Resources.
A discussion of how the traditional construction roadmap is affected by the fast ramp of construction in the boom in semiconductor industry growth - with perspectives from an end-user, OEM, mechanical contractor and engineering firm.
Companies: Enviro-Energy Solutions; Intel; FTD Solutions; Evoqua Water Technologies; Charter
Authors: Bob McIntosh; Dave Buesser; Alan Knapp; Chee Tan; Cordell Tietz
Tags: Construction; Supply Chain; End-user
Related resources
Id | Year | Materials | Info | Company | Author | Tags | View |
---|---|---|---|---|---|---|---|
... | 2023 |
Please login or subscribe to view UPM Resources. |
Enabling Time-To-Market for Next Generation Semiconductor FacilitiesWhat does it take to track millions of details, construct extremely pure environments, and build a new fab from scratch? This webinar brought together some of the most experienced leaders involved in fab construction, as well as thought leaders in artificial intelligence, the digital transformation, and offsite manufacturing.
|
Intel; Ovivo; Bechtel; Buildots | Alex Milshteen; Malek Salamor; Barak Gur-Arie; Jeff Brightman; Peter Murphy | Digital Solutions; Construction; Supply Chain; Fab Operation; Facility 2.0; materials of construction | View |
... | 2022 |
|
Deconstructing the Challenges of Facility 2.0: Device Complexity Drives Facility ComplexityA discussion of how the production of new complex devices is causing complications for the construction and operation of huge new semiconductor facilities.
|
Samsung Austin Semiconductor; Page; Farnsworth Group; Hensel Phelps | Dan Wilcox; Anthony Jeffers; Brandon Ekberg; Danny Zhu; Nabil Mistkawi | Construction; High Purity Gases; High Purity Chemicals; Supply Chain | View |
... | 2022 |
Please login or subscribe to view UPM Resources. |
The case for prefabrication/pre-assembly of preloaded piping racks with full design servicesTo drive the speed of construction and distribute work within available labor pools, there is a strong trend toward off site construction (Offsite Manufacturing or "Design for Manufacturing & Assembly), i.e., pre-constructing off site then assembling or installing on site. There are many advantages to this are discussed in the presentation. Case studies are presented and this emerging construction trend will be discussed, including expected advantages.
|
GF Piping Systems; | John Painter; | Construction; Supply Chain; Distribution Systems | View |
... | 2022 |
Please login or subscribe to view UPM Resources. |
Keynote panel: Facilities' GrowthA discussion of the drivers and constraints of semiconductor facilities' growth, including the talent shortage, construction approaches, site selection and commissioning.
|
Intel; GF Piping Systems; LotusWorks; TSMC | Elizabeth Betancourt; John Painter; Alex Milshteen; Greg Jackson | Construction; Sustainability; End-user | View |
... | 2022 |
Please login or subscribe to view UPM Resources. |
Digitalization ValueA discussion of smart integration of digital technologies, processes and competencies across different levels and function within organizations.
|
Intel; | Assaf Harel; | Construction; Digital Solutions; Data Management; End-user; Modeling | View |
... | 2022 |
Please login or subscribe to view UPM Resources. |
Deconstructing the Challenges of Facility 2.0.: Time-to-market and Supply Chain in the Microelectronics IndustryIntel, LotusWorks, Evoqua and FTD Solutions discuss the microelectronics fab construction boom, the expertise shortage, supply chain bottlenecks, and long lead times.
|
Intel; LotusWorks; FTD Solutions; Evoqua Water Technologies; | Alex Milshteen; Assaf Harel; Dave Buesser; Alan Knapp; James Casey | Supply Chain; Fab Operation; Construction | View |
... | 2021 |
Please login or subscribe to view UPM Resources. |
Intel Keynote 2021This presentation was given as part of the Ultrapure Micro 2021 annual conference. It was given as a keynote presentation
|
Intel; | Dominic Greensmith; | Supply Chain; End-user; Risk Management | View |
... | 2021 |
Please login or subscribe to view UPM Resources. |
Water and wastewater supply chain managementThis presentation was given as part of the Ultrapure Micro 2021 annual conference. It was given as a keynote presentation as part of the water and wastewater management strand.
|
Intel; | Assaf Harel; | Supply Chain; End-user; Risk Management | View |
... | 2020 |
Please login or subscribe to view UPM Resources. |
Proactive Technology Management - Supply Chain in Support of Advanced Technology YieldsThis webinar brought together the perspectives of end-users, high purity polymer material experts, and POU treatment specialists, to present a holistic view of the risks associated with high purity materials and components. Archita Sengupta, Intel, and Bob McIntosh, Enviro-Energy Solutions, opened the discussion by identifying the key technology challenges associated with high purity liquid delivery systems. Followed by a panel discussion of industry experts, the webinar addressed potential solutions and proactive strategies for improving material quality and treatment solutions to ensure high manufacturing yield.
|
FTD Solutions; Intel; Enviro-Energy Solutions; Pall; Evoqua Water Technologies; | Slava Libman; Rushi Matkar; Bob McIntosh; Ashutosh Bhabhe; Jochen Ruth; Alan Knapp; Archita Sengupta | End-user; Supply Chain; Distribution Systems; Wafer Defectivity; IRDS; SEMI | View |
... | 2019 |
Please login or subscribe to view UPM Resources. |
Multiple High Purity Resins Qualification for UPW Systems: Reducing Supply RiskThis presentation was given at the Ultrapure Micro 2019 annual conference. It was presented in the Ultrapure Water Production track, as part of the Analytical session.
|
Samsung Austin Semiconductor; | Varinder Malik; Gary Shrestha; | Ion Exchange; Supply Chain; Risk Management; End-user; UPW Polishing | View |