The case for prefabrication/pre-assembly of preloaded piping racks with full design services

Date Published 2022 | Conference materials

Log in or Join UPM to access this content

To access our resources you will need to be a member of UPM, log in to your account or purchase a membership to view this content.

Already have an account? Log in

To drive the speed of construction and distribute work within available labor pools, there is a strong trend toward off site construction (Offsite Manufacturing or "Design for Manufacturing & Assembly), i.e., pre-constructing off site then assembling or installing on site. There are many advantages to this are discussed in the presentation. Case studies are presented and this emerging construction trend will be discussed, including expected advantages.

Organizations: GF Piping Systems
Tags: ConstructionDistribution SystemsSupply Chain

Related content

Conference material | 2022
Multi-Species PPT-Level Impurity Detection in Electronic Bulk Gases Using Atmospheric Pressure Ionization Mass Spectrometry​
Seminars | 2022
Deconstructing the Challenges of Facility 2.0: Device Complexity Drives Facility Complexity
Conference material | 2023
Modular OSM Constructs for Improved Cost, Schedule, EHS & Environmental Benefit
Conference material | 2022
Keynote panel: Facilities' Growth

Back to results

Not a UPM Member?

Be part of year-round collaboration and knowledge exchange. Get access to the full range of tools leveraged by facility representatives and leading global experts from across the supply chain.

Book a demo

Find out how you can leverage UPM Member Portal to achieve your business objectives today.

Request a demo